how 2 find out slap steel quantity ? plz help me
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
where should the lap of a beam should be
state the functional requirement of a retaining wall
How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.
bar bending schedule?
what is education Cess.
Deshuttering time for slab 6.15 meter
What is the shelf life of a refractory used in boiler furnace ?
What is the difference between chamfer and fillet?
What are the uses of layer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)