Kindly post me previous year interview questions with answer
for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL
and ONGC etc.
No Answer is Posted For this Question
Be the First to Post Answer
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
how to caliculate required amount of cement and sand required for 1cu.m.
how to doing or how to prepare the or which things can be done on the site when construct the building?
please send me bhel questions on rupesh.017@rediffmail.com
Though Column is a compression member and concrete takes compression, why we use steel at column ?
Pls explain me about tension and compression in a flat slab
When was the first motorway built in england?
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
Lapping Work Explain Briefly
comparision difference between GSB and WBM subbase in road construction
if i want to change the dia of some bar in a structure,then which formula should be used to find the spacing for the bar of new dia?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)