how to find out the quantity of cement sand and aggregate
in slab and flooring
Answer Posted / hiten patel
at first volume i.e lenght ,breadth , hieght
den for eg.
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3 or 1.52 m3 or1.55 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
How do you calculate load bearing capacity of a waffle slab?
How do you calculate the power of a centrifugal pump?
Define graphics window?
How many are the types of joints?
The largest size of paper used in plotter to print the drawing made by Autocad .
What quantity of 1.0 m3 bricks required?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
How to increase a bearing capacity of soil?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
how to find quantity of concrete in PCC M15
how to identify the failure of building by expansive soils
What do you mean by bond? What are the different types of bonds?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
When column of building is abutting the boundary line,then suitable footing advised is