What's is mean by survey
Adout concrete
what is cement wastage percentage in NHAI ROAD WORKS
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
what is the shuttering normal clear cover for footings, walls, beams & columnms
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
calculate for 1 m3 cement, sand, coarse agree gate ,kg?
why the cube depth is 150 mm which is used for testing
What is the difference between chamfer and fillet?
How to calculate the rating of airconditioner required in any area,how to calculate the cfm required for any exhaust unit or air washer unit.
6 Answers Changotra Oil Furnace, Dalkia, John Crane,
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)