Can someone please be curing period of the following
according to IS codes
Column
beam
slab
brick masonry
raft found.
and also tell how many hours/day
No Answer is Posted For this Question
Be the First to Post Answer
Formula for calculating the volume of bulb in underreamed pile
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"
what is difference between tor steel & TMT STEEL?
how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
16 Answers ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
what is flexible and rigid footing?
0 Answers IBM, Wah Engineering College,
what do you know lean concrete
Questions related to civil.engg in company
What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and solid blockworks?
how to determine pile length and diameter of pile is there any thumb rule?
a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40
Life of Rcc is taken as 100 years. What will be the life of structure after 10 years. will the strength of concrete increases or decreases.