Can someone please be curing period of the following
according to IS codes
Column
beam
slab
brick masonry
raft found.
and also tell how many hours/day
No Answer is Posted For this Question
Be the First to Post Answer
Explain major difference between auto level and dumpy level?
concrete cube strength if fail 1 no in 7 days .What is the solution
what is the types of surveying?which type of survey carrying for type of work?
4. What is your philosophy / attitude towards work?
brick size-230x110x75, how many no of bricks cover 1cubic meter.
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
Name the standard sand for concrete tests
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
How may kgs. of sand make one brass ?
compression strength of first class brick should be
I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.
why crakes are developped in opening corners
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)