Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the percentage of binding wire required for 1 mt of
steel binding in gerally

Answers were Sorted based on User's Feedback



what is the percentage of binding wire required for 1 mt of steel binding in gerally ..

Answer / er.bishnu pasad mohapatra

approx.10kg/mt

Is This Answer Correct ?    1 Yes 0 No

what is the percentage of binding wire required for 1 mt of steel binding in gerally ..

Answer / satya.mvvs

In bridges wastage is very less, so 8 to 9Kgs (.8% to .9%)
may be preferred.

Is This Answer Correct ?    1 Yes 1 No

what is the percentage of binding wire required for 1 mt of steel binding in gerally ..

Answer / babu lal nayak

thumb rool is 3 kg. bracing wires requre for 100 kg. steel.....

Is This Answer Correct ?    0 Yes 1 No

what is the percentage of binding wire required for 1 mt of steel binding in gerally ..

Answer / vishal r

9 to 11 Kg

Is This Answer Correct ?    0 Yes 2 No

what is the percentage of binding wire required for 1 mt of steel binding in gerally ..

Answer / shlender kumar

it may be 8 to 10 kg

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

how calculate the ms angle weight formula detail

9 Answers   Concor, Puravankara,


What are the important hardware systems used for cad?

0 Answers  


which is code used for ppc cement

5 Answers  


Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?

1 Answers   L&T,


how to calculate rate analysis for shuttering of waffle slab

0 Answers  


What do you mean by tolerance factor of concrete ?

0 Answers  


what is period of de-shuttering for different area of slab of M25 grade?

2 Answers   ATS,


what is the wight of 4"/6" solid block?

2 Answers  


why do we not deduct volume of steel to find actual volume of concrete in practical???

0 Answers   Lodha,


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

0 Answers  


how to find hardness of water?why it should be determined?

1 Answers  


Why we test compressive strength after 28 days..?

3 Answers   NM Caramoan Builders,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)