what is the percentage of binding wire required for 1 mt of
steel binding in gerally
Answer Posted / shlender kumar
it may be 8 to 10 kg
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How to find beam R/F cutting length
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is meant by shear center?????
How to calculate the force on a column of three story building. What should be the base concrete height?.
For what purpose bedding is used under storm water drains, explain?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
What is Rankine Cycle?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
In case if concrete box girder bridges how is the number of cells determined?
What is a hatch patterns?
What is dead load impact load live load
pls mail some more tecnical qustions at msaranya2610@gmail.com