what is the percentage of binding wire required for 1 mt of
steel binding in gerally

Answer Posted / satya.mvvs

In bridges wastage is very less, so 8 to 9Kgs (.8% to .9%)
may be preferred.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how we check the thickness and line of ceiling plaster.

2221


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1424


Why you are leaving present job?

1599


Questions related to civil.engg in company

1572


What is geopolymer based concrete?

2146






what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

3529


How to make a c++ program that converts any base to base 10?

1615


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

1502


What is the difference between engineering stress and true stress?

652


How many cum of 9.5mm stone in 1 ton ?

2098


What is the average density of soil?

674


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

649


Explain how you can use different dimension tools in CAD? What are the different dimensions available?

651


how to identify np3 pipe and np4 pipe

1528


what is the specific gravity of rubble in plum concert

971