WHICH SUPPLY IS BETTER FOR 4 MW LOAD.
1)TO TAKE NEARER AVAILABLE 11 KV SUPPLY OR
2)TO TAKE 33 KV SUPPLY WHICH IS AVAILABLE AT 10 KM DISTANCE
BY INVESTING NEARLY 50-60 LACKHS
Availing supply from nearby 11 KV line ,does not make it a dedicated supply as there are many dist trs on it and VR may exceed the limit for 4 MW. You can expect frequent power failures . Reconductoring may also be necessitated
Is This Answer Correct ? | 0 Yes | 0 No |
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting
0 Answers Oman Cables Industry SAOG,
Why we check only first column of root locus..?
can we use breather in a SEALED power or distribution transfomer instead of injecting nitrogen.
how to commissioning the genset with amf panel?
why the supply frequency in india is 50hz?
i am getting to neutral earth voltage zero ,is this a perfect earthing ?
WHAT IS TANK CKT.?
How to Select a Transformer Rating ?
3 Answers Tata Steel Limited, Techno Electric and Engineering, Vedanta,
directional over current relay when acted & how it works
In 63kva LT Distribution Box Why the outgoing of 63A kit kat is connected to 200 A link disconnector? as the output of kit kat is only 63 A?
IF 5000amp current on LT 440V. then how much it will draw amp on HT 11KV side
how can i find cable size from current rating?