Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the PLC Level & type.

Answers were Sorted based on User's Feedback



What is the PLC Level & type...

Answer / md ziaul haque

PLC is programmable logic control its good for on off control there is no level these days our science is very developed. They developed PLC all DCS feature is there

Is This Answer Correct ?    10 Yes 7 No

What is the PLC Level & type...

Answer / md.nayeemuddin

A programmable logic controller (PLC) or programmable
controller is a digital computer used for automation of
electromechanical processes, such as control of machinery on
factory assembly lines, amusement rides, or light fixtures.
PLCs are used in many industries and machines. Unlike
general-purpose computers, the PLC is designed for multiple
inputs and output arrangements, extended temperature ranges,
immunity to electrical noise, and resistance to vibration
and impact. Programs to control machine operation are
typically stored in battery-backed-up or non-volatile
memory.
As an example, say a facility needs to
store water in a tank. The water is drawn from the tank by
another system, as needed, and our example system must
manage the water level in the tank.
Using only digital signals, the PLC has two digital inputs
from float switches (Low Level and High Level). When the
water level is above the switch it closes a contact and
passes a signal to an input. The PLC uses a digital output
to open and close the inlet valve into the tank.
When the water level drops enough so that the Low Level
float switch is off (down), the PLC will open the valve to
let more water in. Once the water level rises enough so that
the High Level switch is on (up), the PLC will shut the
inlet to stop the water from overflowing. This rung is an
example of seal-in (latching) logic. The output is sealed in
until some condition breaks the circuit.


| |
| Low Level High Level Fill Valve |
|------[/]------|------[/]----------------------(OUT)---------|
| | |
| | |
| | |
| Fill Valve | |
|------[ ]------| |
| |
| |


An analog system might use a water
pressure sensor or a load cell, and an adjustable
(throttled) control (e.g. by a valve) of the fill of the tank.

Is This Answer Correct ?    3 Yes 5 No

Post New Answer

More Instrumentation Interview Questions

what is KV and XV valve

0 Answers  


I have a problem with a valve (air to close). When it is fully closed and try to open 1% it doesn't responce till 3% open suddenly more than 3% then back to 3%. I tried to tune positioner then removed it, the problem still exist. Any idea

3 Answers  


Why are the uses 24vdc in industries

0 Answers  


Hello friends i need check lists of different instruments during the Erection and commissioning in thermal power plant.Please help me.My Mail id is naba02222@gmail.com/naba02222@rediffmail.com Thanks Nabakishore Biswal

1 Answers  


how we can calibrate split range control valve?

1 Answers  


What is the use of the shield wire and how is the connection at both the ends of a shield wire?

2 Answers   Samsung,


a flow transmitter [range-0-400mbar] connected in process line. please explain me how to calibrate the flow transmitter , & how to do static error

0 Answers   L&T,


Hi Friends i am going to write BARC written test by this month 20th (20-5-2008). So please if any body knows the details about this or having previous question papers pls mail me to kkumarei@gmail.com. For Suggestions give one message to 9962122264

0 Answers   PDIL,


What Is Pre- Commissioning Package +what is DCS & ESD Pre- Commissioning for Instruments Please explain your answer on practical ground base

0 Answers  


How a oxygen sensor & analyzer work at boiler or furnace, what’s the principle & science is beyond this, How O2 sensor scene & convert signal & move toward analyzer & analyzer show reading in percent?

1 Answers   GS Engineering Construction, KNIC,


Qatar fertilizer call me for interview as Instrumentation Project Engineer. Please let me know what kind of question they asked ? ALso they said they will take Written test, any idea about this written test ?

1 Answers   QAFCO,


why 1 to 5 vdc is used for output measurment

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)