What is meant by End contractions
Answer / mallikarjuna (nitw)
The end contact surfaces of any waterway openings like in
Notches,Weirs,Canals etc. which causes reduce of quantity
of flow or Discharge is called END CONTRACTIONS
| Is This Answer Correct ? | 53 Yes | 6 No |
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
how many litres of enamel paint required for 5000 sft of site??
how to calculate the number of cement bags required for 1m3 of work
How many binding wire is use in arrangement of 25mt steel
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
What is the proportion of cement agg. and sand for M20,M25 and M30?
How to calculate the design of column by simple method?
What is Dewatering ?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
How much do you want salary?
i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)