What is meant by End contractions
Answer / mallikarjuna (nitw)
The end contact surfaces of any waterway openings like in
Notches,Weirs,Canals etc. which causes reduce of quantity
of flow or Discharge is called END CONTRACTIONS
Is This Answer Correct ? | 53 Yes | 6 No |
what is the development length formula as per concrete grade
why wire mesh is used in plastering
how much CM required for Random Rubble masonry in CM 1:6
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
0 Answers Alfanar, Ancon, RAZ,
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
what is the percentage of silt in black cotton soil.?
what is bolt value?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How can explode a block?
what is mc arther pile?
What is the basic difference between OPC
How to convert sqft in cft