Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.How much strength will be attained for M30 grade of
concrete after 28 days?
2.Is it attain 30 N/mm2 or target mean strength?

Answer Posted / shubham singh

1: M30
Target strength for mix proportioning
f’ck = fck + 1.65 s
Where
f’ck = Target average compressive strength at 28 days,
fck = Characteristic compressive strength at 28 days,
s= Standard deviation = 5 (IS 10262:2009, table 1)
From Table 1 ( IS 10262:2009, Clause 3.2)
f’ck = 30 + 1.65 * 5
= 38.25 N/mm2
2: It should attain target mean strength

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1911


what is the meaning of degreasing of the euipment or line.

3973


Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

2225


What are the joints wants to made in masonry where door opening, arches like etc..

1675


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2219


Which is the direction of negative angle?

1039


Explain the various stages of the project planning process in construction?

1109


Explain the latest method to detect a crack in a building?

1120


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2006


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

1088


Can we use the flyash bricks in brick bat coba?

1485


How many days should curing of plastering, brick work and concrete

1628


How do you prepare Material Recovery Statement for deduction from contractors bills?

1662


What things you need to take care of before building a kitchen island?

1125


how many cement used in single story residential building per sqft

1689