1.How much strength will be attained for M30 grade of
concrete after 28 days?
2.Is it attain 30 N/mm2 or target mean strength?
Answer Posted / bidyut dey
1.after 28 days it will be attained 30 N/MM2
2.Terget mean strength
| Is This Answer Correct ? | 29 Yes | 4 No |
Post New Answer View All Answers
Why we provide hair pin for shed
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Why nautical mile is different from statute mile?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Cement consumption of one cubic meter of aerocon blocks masonry?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
Explain the mechanism of cavitations in pipes and drains?
What is the snap size in civil and how can we create it?
please briefly explain calculating or estimating steel quantity for a RCC column?
what is the steel difference between np-2 and np-3 pipes and weight also
What is bylayer?
how much cement and sand required for 1cum rr masonry
what is the productivity in aluminium shuttering per day