procedure for preliminary selection of size of column of 5
storey building
No Answer is Posted For this Question
Be the First to Post Answer
how to remove the quantity of metal 1 and metal 2 in concrete
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design
calculate if the size of the beam is 300*500 then L for the top & bottom bar
how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?
curing duration
5 Answers Arun Excello, L&T, Proton Construction,
how can we differentiate the KOTA STONE and SHAHABAD STONE by vision?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
what is that one cub metre plaster in cemant and fine sand
0 Answers IVRCL, Kanti Thermal Power Station, Unity Infraprojects,
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
0 Answers Golden Bridge Contracting,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)