What position do you prefer on a team working on a project?
Answers were Sorted based on User's Feedback
Answer / rajesh kumar shukla
I prefer to working as the team leader because leading is
good the indivisual as well as for the company.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rakesh.r
Honestly with my personality, I prefer being in charge of team
projects. Only because I know I would be most likely the only
person who can get the job done right.
| Is This Answer Correct ? | 0 Yes | 1 No |
What is meant by stages in turbine....what is there purpose....????
What is the temprature used in dearator tank?
difference between stress and pressure?
DURING STEAM BLOWING OF PIPE LINE, A BLUISH COLOR CONICAL PATTERN IS OBSERVED AT THE END OF PIPE. WHATS THE CONCEPT BEHIND IT?
sir,i appllied junier engineer engineer in rrb chennai,i need syllabus for the topic of apptitude,reasonong,general english and mechanical engineering,and general studies.please sent my mail id aravindaptc@yahoo.co.in.
Enumerate the cause of pumps low delivery of water
What will happen if there is moisture in refrigeration system
IN A THERMAL POWER PLANT, WHY IS THE USED STEAM CONDENSED INTO WATER AND THEN SENT BACK TO THE BOILER, WHY NOT DIRECTLY REHEAT THE SAME STEAM??
funtion of cluch
what is servo motar?
CATIA:SPRING WITH SOME RADIUS AXIS
what is the difference between fire grate in a boiler and the burner? and is the fire grate is the furnace of the boiler?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)