Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.
Answers were Sorted based on User's Feedback
Answer / raju
Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area
feel free to call me
Raju
Engineer-Civil
9999213613
DLF
| Is This Answer Correct ? | 60 Yes | 3 No |
Answer / raja j
in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal
for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)
for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))
Raja.j
9626389621
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / jigar soni
V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / s.prabhu
Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)
Volume of top / slope portion is called as Volume (v2)
V1 = L1xB1xh1
V2= h2/3* (a1+a2)* square root of (a1+a2)
L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2
For any clarification
Please call
S.Prabhu
9901702081
| Is This Answer Correct ? | 7 Yes | 4 No |
Answer / krishna kumar.a
Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum
| Is This Answer Correct ? | 9 Yes | 7 No |
Answer / sekar.k
QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L
EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :
1/2*H(A+B)*L
1/2*6.00(2.00+4.00)*10.00
1/2*6.00(6.00)*10.00=180.00CUM
| Is This Answer Correct ? | 5 Yes | 4 No |
Answer / nadim
divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension
| Is This Answer Correct ? | 1 Yes | 12 No |
i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
how to find the quantity of materials required for constructing a wall of length 10*5*.2m?
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
How many cement sand ballast in cc 1:4:8 40mm
how can we calculate costing of a project per sqft/sqm
1 Answers Associate Consultant, AVT, L&T,
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
which type of foundation are most prefarable in blockcotton soils
how to calculate steel in slabs ?
what is the basic fundamental of contouring?
what is lever arm constent formula?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)