Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.
Answer Posted / jigar soni
V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
how i get all type of short type question answer about civil engg
what is BPM in concrete demolition hammers. what is better a higher value or lower
In a concrete grade C35A, C & A stands for what and equalent cube strength?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
If specific gravity of cement is less than 3.15 what is the cause?
Why concrete barriers have curved surface profiles?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Where will be the maximum bending moment in a TEE Beam?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is made from large rocks, which protects the base of cliffs?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building