advantages & disadvantages of using crusher dust instead of
sand in r.c.c work
Answers were Sorted based on User's Feedback
Answer / nadim
the only advantage of using crusher dust in concrete is to reduce the volume of sand in the concrete mix whereas the disadvantage if we use complete dust in mix is it get mix with cement and form concrete balls which is not good in concrete mix design
| Is This Answer Correct ? | 22 Yes | 20 No |
Answer / salim mansuri
there is basic property (physical and chemical) difference in cement, and crusher dust, so it does not bind each other properly and therefore there may create hair like creack, hence the durebility of the concrete and building structure reduces this is the big disadvatage of using the crush sand.
| Is This Answer Correct ? | 2 Yes | 4 No |
Answer / islam sami
the question should give us more details like FM of this dust ,absorption and material finner than 200 micron but any way
in case of FM is 2.5 % as example
the advantage using low water cement ratio and less percentage of chemical admixture at concrete mix
hing durability concrete performance specially dry shrinkage
the disadvantage of using crushed rock or gravel are
bleeding of concrete cause of less absorption
harsh concrete due to surface texture of it's particle
high air content of the concrete
lowest strengths at early ages
the question is wide cases so it maybe have a lot of answers
| Is This Answer Correct ? | 0 Yes | 7 No |
what is the detention period for oxidation ponds
minimum thickness of pcc 1;4;8 for road concrete
How are freeway bridges built?
HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.
which type of cement is used for RCC construction?Why?
How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
water leak detection system question & answer
What is gravity flow?
what is the difference between linear and curved elements?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
how much binding wire is required for one tone steel
20 Answers Gammon, Hinduja, Jindal,
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)