Answer / ashit
For an auto level,bubble can be adjusted from any angle and
from any side but in dumpy level,for levelling of bubble
first u have to keep bubble parallel to two levelling screws
and then right angle to third screw.
| Is This Answer Correct ? | 171 Yes | 31 No |
Answer / sagar sontakke
Above answer is partially right.Major difference between these two is, in auto level readings are actual as staff seen from the eye piece is straight where as in case of dumpy level staff is inverted so that we have to adjust the readings accordingly.
| Is This Answer Correct ? | 104 Yes | 21 No |
Answer / kabilan m
in dumpy level we have to adjust the bubble level as said above.
and
in auto level there comes a internal compensator mechanism (a swinging prism) which takes care of adjusting the line of sight, so no need of leveling the bubble. it is most preferred in road construction...
| Is This Answer Correct ? | 40 Yes | 9 No |
Answer / chattu
auto level are shown down to uper level reding but dumfy level ar shown uper to down lavel .
| Is This Answer Correct ? | 2 Yes | 1 No |
State the type of roads and compare the advantages and disadvantages?
calculate qty of sand in 15 mm plaster for 100 sqm.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
what is your role of in previous company as a construction manager
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
how to calculate the quantity of plaster.
Which IS code is saying the detail of deshuttering period?
how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 Answers DCPL, EverSun, Pace Power Systems, Sobha Developers,
what is Tsunami. explain it's formation.
what is the best method for analysing frames of multistoreyed structures
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
The portion of a brick cut across the width is called?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)