Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is diff between auto level and dumpy level?

Answer Posted / sagar sontakke

Above answer is partially right.Major difference between these two is, in auto level readings are actual as staff seen from the eye piece is straight where as in case of dumpy level staff is inverted so that we have to adjust the readings accordingly.

Is This Answer Correct ?    104 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate construction cost of residential building in mumbai

2035


how much tempareture are required to make liquid state of pid leed

2213


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

2112


punj loyed and sapurjl palanjl

2360


whaat is blister in box girder bridge and what is its function..

4923


what is the percentage of silt in black cotton soil.?

2389


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

2161


What is the biggest dam in america?

1167


types of survey and levelling instrument ?

1852


how clculate excavated or backfilling quantity by simpson's rule

5122


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

3311


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

2090


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2305


how to identify the failure of building by expansive soils

1649


In reclamation works what are the importance of geotextiles and sand?

1140