what is the mode of method of face bar measurement
No Answer is Posted For this Question
Be the First to Post Answer
Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
Deshuttering time for slab 6.15 meter
For a washout valve why are two gate valves required in normal practice?
What is thumb rule in quantity and cost estimation of a residential building?
0 Answers Ascent Constructions,
what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???
.5Ast
how to calculate upthrust pressure of under ground water tank in wet soil?
Please tell me 1 Sqm Steel 14mm center to center .200,.200
how to check the quality of concrete
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
What do we mean by partial moment release ??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)