Answer / sandy
we calculate all this in covered area
in which dry/open balcony and any projection
on which we spend a single payee
in this calculation window sill not include
and deduction are plumbing shaft/services shaft/garbage
which are OTS will be deducted no fire or electric shaft
deduction.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / abhijeet gavkar
For Conc. : .025 Cmt. / Sqft.
For Steel
G+8 stored : 3.75 Kg./Sqft.
G+14 stored : 5.00 Kg./Sqft.
G+20 and above : 7.00 to 8.00 Kg./Sqft.
Is This Answer Correct ? | 1 Yes | 1 No |
what is the minimum cement content for rcc as per is code
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
very simple or less time consuming formula for reinforcement calculation by moment
what is the measure of slump
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
1. What type of job are you holding at the moment? Name of present / last employer?
What is the curing period for Epoxy grouts
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is ment by surveying?