how to calculate testing date
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What is the proportion in M-20, M-25, M-30 grade of concrete?
Laboratory experiments conducted in Mumbai on a particular mix showed a strength of 33 MP a for a fully matured concrete. Find whether formworm can be removed for an identical concrete placed at Jammu at the age of 15 days when the average temperature is 60C. The stripping stress in concrete
How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
The slenderness ratio of a column is zero when its length ??
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
why wire mesh is used in plastering
Sir please send me the BHEL civil enginering trainee model Question papers.
Calculate no of brick req 230cmx115cmx100cm
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)