what is the cutting length of 90 degree bend in four corner
ring in column of 8mm dia size of column 450mmx250mm of
clear cover 20mm?
Answer Posted / devender singh
Cutting length=2*410+2*210+2*80-5*2*8=1320mm
(10d hook & deduction of 2d on each of five bends)
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What is the use of offset command?
Why should you consider yourself fit to be hired by jindal steel.
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
What is a kip?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what is the permanent solution applied for restoration of leaning tower of pisa?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
howto calculate the quantities of material used in fly ash brick after finding the volume??
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Why the finite element method is lower bound solution?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??