what is mail role & relationship between senior Civil
engineer to consultants , Construction manager ,project
manager, project engineer ,Technical engineer & qa/qc
engineer ? what is the responsibilites of Senior Civil
Engineer?
No Answer is Posted For this Question
Be the First to Post Answer
how much binding wire required per tonne slab beam columns
Describe why concrete must be compacted after it is poured?
How do You Maintain a structure after getting cube test of low strength.
how to calculate sand in CFT from a concrete foundation (m^3)???
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
what is the weight of 1 meter iron road if its diameter is 20milimeter. 2.when we find the weight of 1meter iron road we help the following formula dxd162 .what is 162 plz tell me
How much qty. of cement used for laying 1 Sq.Meter of tiles(600mmx600mm)
types of survey and levelling instrument ?
what is specific gravity of soil?
what is the basic fundamental of contouring?
What is cold joint, what will happen due to cold joint?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)