What is Time at Large?
Answer / er. abhijit sane
Time is at Large when the project is likely to extend
beyond its dead line. Time is at large when there are
events which adversly affect the execution of the works and
result in dealy.
The delays may be due to deficiencies on part of the
Contractor or Owner
| Is This Answer Correct ? | 5 Yes | 1 No |
how many lab test on bricks and aggregate write briefly please
where does the hinged action while designing the strture
1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
1:6 mortar, how many self life hours ?
how to calculate the density for high density concrete ? or is it same as the density of RC?
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
how many shuttering material required for 1000 sq.m built up area.
25. Are you willing to work overtime?
what is mean by centrifugal force which is act in vehicle on superelevation of road?
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
why there is curve at the end in channel sectin
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)