What is Time at Large?
Answer / er. abhijit sane
Time is at Large when the project is likely to extend
beyond its dead line. Time is at large when there are
events which adversly affect the execution of the works and
result in dealy.
The delays may be due to deficiencies on part of the
Contractor or Owner
| Is This Answer Correct ? | 5 Yes | 1 No |
what is the tool used at construction site for measuring cement, sand and blue metal in india.
psc girder detail
What is gravity flow?
time and work questions
How many types of slabs are there & how to design it?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is differnce between founadation & footin ?
Okay guys I m new here i wanna ask you that ,if i mix two three larger stones (about 20cm dia)in concrete for column or footings what actually happens, how the strength of concrete is reduced? and why it is not allowed?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
For a three storey residential house,tmt steel of what grade is good fe415d or fe500d
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)