Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Are you connected Transformer neutral eathing with it's
body earthing or earthing met of switch yard.? Yes or No ?
why ?

Answers were Sorted based on User's Feedback



Are you connected Transformer neutral eathing with it's body earthing or earthing met of swit..

Answer / manish

NO, Transformer netural and body earthing connected
saperataly becouse at the time of winding foult and
transformer internal foult foult current transfer with
netural earthing if you are netural earthing joint with met
in that time other electrical equpment can damage.

Is This Answer Correct ?    8 Yes 1 No

Are you connected Transformer neutral eathing with it's body earthing or earthing met of swit..

Answer / prabhat misra

in this case transformer neutral is solidly grounded or it is connected to separate earth pit not with switchyard grid as to overcome any of the fault of switchyard equipmenht and also to protect the switchyarsd equipment from any of the internal fault of Transformer

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is meant by sag?

0 Answers  


why can't we provide dc supply to a transformer?

2 Answers  


Why the underground cables will Punchar? or what is the reason to burst the underground cables?

1 Answers  


how to calc. current for 5MVAR,50hz,33kv

1 Answers  


IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO 11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE LOADED ABOVE THE SOURCE GENERATOR RATING?

4 Answers  


What are the necessary solutions needed to be carried out on a malfunctioned earthing mechanism of a VACUUM CIRCUIT BREAKER.(TAMCO)

0 Answers  


What is core CT & it's function?

0 Answers  


What meant by lagging and leading? When if they are occurred what preventive methods should be taken?

14 Answers   ABB, L&T,


A 6-pole, 50 Hz, 3-phase synchronous motor and on 8-pole, 50 Hz, 3-phase slip-ring induction motor are mechanically coupled and operate on the same 3-phase, 50 Hz supply. If they are left open-circuited, then the frequency of the voltage produced across any two slip rings would be

2 Answers   L&T,


how can we can take BDV test in transformer?

5 Answers  


what is voltage

7 Answers   TCS,


what can i do, if i want to carrier in design as i am electrical engg?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)