How to Know that veriation acceptable in CPWD Work Of 1:6
Cement Mortor Received Lab test report.
No Answer is Posted For this Question
Be the First to Post Answer
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
What is full form of r.c.c?
difference b/w stress and strength
Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.
How much cement and water required for cement selery????
What is meant by M20 grade of concrete???
What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
What letter follows after these, O, T, T, F, F, S, S, E, __?
How to build the floor to ceiling bookcase?
what are the questions that will be asked in interview in civil engineering
In which code or text book can i get the reinforcement detailing for slabs, beams, columns.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)