What are the points to be considered for calculating cement
reconciliation.
a)Do we need to deduct the wt of cement bags
b)Do we need to adjust the qty due to wt loss during
transportation, loading unloading etc or else each bag can
be considered as 50 kg bag
c)What is the proportion of mix cover block making.
No Answer is Posted For this Question
Be the First to Post Answer
Why should you show Client/Engineer activities clearly on the project plan?
How to calculate super built up area in residential building
what is calculation of cement, snd of 1:4 16mm,12mm plastring
why mixing marble powder reduces setting time of cement
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
In block work seawalls what is the purpose of slip joints?
Which foundation is stronger, Pile or Standard?
what is the service corridor?
What is creep ,deflection and shrinkage in concrete
Water absorption for stone?
I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?
how many covering can be taken in the beam,column & slab also stair-case?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)