What are the points to be considered for calculating cement
reconciliation.
a)Do we need to deduct the wt of cement bags
b)Do we need to adjust the qty due to wt loss during
transportation, loading unloading etc or else each bag can
be considered as 50 kg bag
c)What is the proportion of mix cover block making.
No Answer is Posted For this Question
Be the First to Post Answer
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
why we leave expansion joint between to complex
What is tha cutting lenght off samosa ring in column 300*600.
What is Purpose Of Stirrups give In Beam ?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Density of 10 mm aggrigates
4 Answers BRB Construction, GPL,
Why are separation membranes used between concrete pavement slab and sub-base?
what is mean by hysd bar?
what is singly & doubly rc beam? what is difference between them?
fluid flow takes place due to its:- viscosity,comprssibility,surface tension,deformation undershear force
WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,