As a site engineer what do you check in foundation before
concreting
Answer Posted / ankit
soil bearing capacity,type of soil,hard soil availability,near by natural and man made structure affecting soil.other factors may be there ,depending on the site condition.
| Is This Answer Correct ? | 17 Yes | 6 No |
Post New Answer View All Answers
What is structural frames or systems?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
why we are using stub column..? is it possible to construct steel stub column..?
What was asked in isro civil interview
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is the service corridor?
What is the diameter of the 3"inch nails?
In Rcc ratio calculation I wanted to know quantity of Steel also.
What is the use of extend command?
how to design and calculate materail quantity for concrete speedbreaker ?
What are the materials used in building a gravity dam?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
what is the procedure of wet seiving. n percentage of silt in different type of soil?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water