What is higher heating value and lower heating value? Is it
positive or negative?
No Answer is Posted For this Question
Be the First to Post Answer
hi can anyone tell me some technical questions asked in iocl
What is the best way to handle bend or turns in slurry piping systems?
what is petrol density ? why ?
We are having proplem with the persperation smell in ETT/ECHO room in our cardiac hospital.The 2 Ton of AC is not conditioning the environment. We have to use exhaust fan to through out of the room bad air. Could anyone suggest how to coup with this effectively using chemical engineering. Any permanent solution to neutralise the bad smell.The Air freshners are not doing enough instead making a bad odour.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.6 : In a random walk, a stochastic process starts off with a score of A. This is a score for a chemical engineering test. At each discrete event, there is probability p chance you will increase your score by B and a (1 - p) chance you will decrease your score by C. The event happens T times. Let D = expected value of score. (a) Form an equation of D as a function of A, B, C, T and p. (b) Find the value of D if A = 60, B = 1, C = -1, T = 50, p = 0.5.
Are some heat transfer services more prone to tube vibration that others for a shell and tube exchanger?
sir, kindly explain to me that how to calculate volume of torrispherical vessel which is used in pharma company ss reactor bottom dish volume. thank u.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.30 : A biochemical engineering sales contract adopts Cost Recovery Method in its company accounting. Gross profit is realised only when cash collections exceed the total cost of goods sold. Let Y = Original Cost Recovered, Z = Gross Profit Realised. Its property was sold at A = $500k with cost of B = $300k. Its engineering accountant receives cash of C = $240k in first year, D = $180k in second year and E in third year. (a) Find the values of Y and Z in : (i) first year; (ii) second year; (iii) third year. (b) What is the exact value of E if all cash has been fully received from sales?
how interstage pressure of multistage compressor is calculated?
1.How a chlorine leak is detected? 2.What would happen if excess chlorine is added to water in cooling tower?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
i want pattern of ONGC Written examination
13 Answers IOCL, ONGC, Reliance,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)