How Much span required for 1 sqm of shuttering(Beam & Slab)
Answer Posted / sumeet rathod
1.for 1 sq/m slab reqired = 2span @ .600c/c
2.for beam support vertical iron props are required always, 1st prop kept from column at a distance of .230 and than .600 c/c
| Is This Answer Correct ? | 8 Yes | 5 No |
Post New Answer View All Answers
What is Rankine Cycle?
Explain what is 1/8 on the architect ruler denotes?
What goals do you have in your career?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
How many % we consider for lap for reinforcement for estimates
What is the material consumption- cement,sand,tiles etc for Toilet dado?
What is semirigid connections?
What is kn measurement?
Define different types of roof systems?
what is diversion?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Aptitude, reasoning, quants, verbal and technical question
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
what is hydrostatic paradox?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)