If I do M tech in chemical engineering from iit kgp,iit
delhi or iit kanpur...what are the job opportunities,and
what salary they offered.plz tell me...i had 156 all india
rank..i did not take admission ..but this year i m thinking
to take admission...
Answers were Sorted based on User's Feedback
Answer / gns
it will be better to complete mtech from iit for future scope.
after completion of mtech from iit there are so many
opportunities to work.
the major opportunity is phd study. if some is not intrested
in phd then there are full chance of placement in iit campus
interview.
the salary offered in iit is 6 laks/annum on avg.
| Is This Answer Correct ? | 25 Yes | 13 No |
Answer / paras
no this is no answer because a graduate from iit will be surely getting 4 lac per month
| Is This Answer Correct ? | 2 Yes | 29 No |
Explain what is the method involved in analyzing powders for composition?
BIOPROCESS ENGINEERING - EXAMPLE 14.2 : An aqueous solution with 2.5 g of a protein dissolved in 600 cubic centimeters of a solution at 20 degree Celsius was placed in a container that has a water-permeable membrane. Water permeated through the membrane until the h - level of the solution was 0.9 cm above the pure water. (a) Calculate the absolute temperature of the solution, T in Kelvin, where T (Kelvin) = T (degree Celsius) + 273.15. (b) Calculate the osmotic pressure, P of the solution by using the formula P = hrg where h is level of the solution, r is density of water with 1000 kg per cubic meter, g = 9.81 N / kg as gravitational acceleration. (c) Calculate the concentration of the protein solution, C in kg / cubic meter. (d) Calculate the molecular weight of the protein, (MW) = CRT / P where R = 8.314 Pa cubic meter / (mol K) as ideal gas constant.
How to determine the particle size distribution for a given bulk solid?
What is the largest application for surfactants?
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
what is defferance between tubular & automotive plate battery
What is minimum fluidization velocity?
What types of metals are typically removed via chemical precipitation?
colour of flame is blue as well red. why?
respected sir,i have been selected in the written examination(CHEMICAL) of IOCL Panipat held on 30 m1rch, So please tell me which type of questions asked in this interview frequently.Can u mail me some questions?
22 Answers HCL, HCPL, HPCL, IOCL,
What is the angle of repose and what are its applications in the chemical industry?
why rotameter has variable area?? is it necessary??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)