ENGINEERING DRAWING - EXAMPLE 18.2 : For a Vernier scale that consists of 0.11 cm per section, estimate the length on actual standard ruler of 0.1 cm per section for 2.39 m and 0.91 m.
ENGINEERING DRAWING - ANSWER 18.2 : For 2.39 m, length on standard ruler = 2.39 - 0.99 = 1.4 m. For 0.91 m, length on standard ruler = 0.91 - 0.11 = 0.8 m. The second decimal numbers for both Vernier scale and standard scale should be the same. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
Is This Answer Correct ? | 0 Yes | 0 No |
Are there any special considerations to be taken into account for combustion ammonia?
What are the design considerations for a piping system for the transfer of slurries?
Is there any way to remove residual product left in pipes after a batch operation?
PROCESS DESIGN - EXAMPLE 21.3 : According to a heuristic of chemical engineering plant design, assume a pressure difference dP = 4 psi for each 10-ft rise in elevation. A pump is needed to pump liquid from a storage tank at a lower elevation to a heating tank at a higher elevation with the elevation difference of 60 ft. (a) Find the pressure loss due to such elevation. (b) If the required minimum inlet pressure to the heating tank is 9 psi, with 1 control valve is installed between pump and heating tank, what is the dP minimum required for the control valve and the entrance to the heating tank when the heuristic mentions that at least 10 psi is required for the control valve? (c) The pressure at the inlet of the pump is 8 psi and the flowrate of the liquid produces pressure head of 50 psi. What is the total pressure produced by the pump? (d) Assume a pipeline dP of 2 psi / 100 ft for liquid flow in a pipe according to heuristic, what is the approximate maximum length of the pipe in ft that can be installed between the pump and the heating tank?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.25 : (a) If an engineering company has a policy to maintain A % debt ratio, it will limit its total debt B, to A % of all company assets with total assets C. Find the value of A as a function of B and C. (b) An engineering consultancy that designs biochemical processing plants has a beginning balance in a bank of value D. The interest paid by the bank to the consultancy for the saving is E. The consultancy withdraws F amount of money from the bank to cover the project cost. (i) Calculate the end balance in a bank of the consultancy by using the symbols of D, E and F etc. (ii) Find the value of the principal due to E and F.
Hi, I want to validate an analytical procedure of a specified impurity, but this impurity is unavailable for me. can I use the API instead of impurity in the linearity test? in Which reference can I find such information?
What is an effective means of removing silicon from aluminum?
what are the major problem comes in the production process
2 Answers Atul, Deepak Fertilisers,
distillation types (vacuum, azeotropic, steam, extractive)
What is the working of vaccum distilation coloumn in a petroleum refinary?
How does a chemical get ignited without external heat source on reaching its auto ignition temperature
ENGINEERING MATHEMATICS - EXAMPLE 8.3 : Solve the first order differential equation : (Z + 1)(dy/dx) = xy in term of ln |y| = f(x). Z = (x)(x).