Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Transformer/insulating oil tester(BDV tester)



Transformer/insulating oil tester(BDV tester)..

Answer / randy

Email:oiltester@yahoo.cn

Manual of Transformer Oil Tester

1. Introduction:
IIJ-II Transformer Oil Tester is produced by our company,
which adopts industrial single plate integrated circuit,
new-style I/O jack, with unique inspection and anti-jamming
technology to greatly improve its reliability and
functionality.

Main features:
1. Easy operation, high autoimmunization (only press
button once and all work done automatically)
2. Menu management, data input simple and convenient
3. It can store 99 data of oil sampling tests, the
test data can be reviewed and printed in 100 years even
after power is off.
4. The clock in going on after power off.
5. The software can be upgrade through RS232 terminal.
6. Strong anti-jamming, high precision testing.
7. Small measurement, light weight, and convenient for
outdoor operation.

2. Technical parameter

1. Power supply: AC220V ±10%, 50Hz
2. Output voltage: 80kV, 100kV
3. Capacity: 1.6kVA, 2.0kVA
4. Speed of voltage increase: about 2kV/S
5. Voltage inspection accuracy: 1%
6. Breakdown sensitivity: <0.1kV
7. Waveform distortion: &#8804;3%
8. Breakdown response time: &#8804;&#61489;&#61488;ms
9. Working environment: temperature: 0&#61616;C~40&#61616;C,
humidity: max relative humidity 85%
10. Storage environment: temperature: &#65293;20&#61616;C ~ 60&#61616;C,
humidity: max relative humidity 75%

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How to calculate the sag of OPGW during stringing???

0 Answers  


In simply words(not explain any formula )what do you mean by power factor.?

5 Answers   DRDO,


Logic using 1 kV or 1,1 kV grade in house wiring Low voltage cable. Explain/suggest? some use 1kV and some prefer 1.1kV grade insulation low voltage cable why??

0 Answers  


what is Ith current?

4 Answers  


What is the maximum and minimum rating of UPS?

0 Answers   Indiabulls,


What should do when induction motor take more load in single phase ?

1 Answers  


what is the meaning of "i.p.-43" and duty cycle-s1 on the name plate of a asynchronous machine?

1 Answers  


what is the use of terminals in transformer ?

1 Answers   Core Solutions, Honeywell,


why control circuit voltage always chooses to be 110v and 220v? and in where it is 110v and 220v? and in where it AC and DC?

2 Answers  


What is plugging as applied to an induction motor?

3 Answers  


List few applications of d.c series motor?

0 Answers  


what is the major difference between dc generator and synchronous generator?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)