Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how air lock will be removed from generators, how it happens?



how air lock will be removed from generators, how it happens?..

Answer / senthil

through the nozzle

Is This Answer Correct ?    4 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

why nutral and earthing wire connect with each other in main panel board.?

2 Answers  


which is more dangerous AC\DC supply

3 Answers  


Why celling fan rotates in anticlockwise direction and table fan in clockwise direction ? Give technical reason.

5 Answers  


what is the best transformer oil breakdown voltage?

0 Answers  


WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?

0 Answers   KPRS, L&T,


defination of generator

7 Answers  


what happens to a turbo alternator if it get trip and 1 out of 3 poles of circuit breaker in close condition

1 Answers   wbsedcl,


how to find the transformer neutral copper earthing size 

1 Answers  


why the capacitor bank unit is kvar

3 Answers   Infosys, L&T,


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.

0 Answers  


How generator NPS(NEGATIVE PHASE SEQUENCE TEST)TEST WAS DONE? PROCEDURE WITH DETAILS?

0 Answers  


i want to know d working mechanism of tafe tractors next i like to know d engine type of apache bighs can anyone help me

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)