Answer / mansingh hembram

It's depend on consumption of steel per square feet area
generally, Rs 3.2/kg Consumed steel 3Kg/Sft.
Rs 2.7/kg " " " 4Kg/Sft.

Is This Answer Correct ?    11 Yes 2 No

What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??..

Answer / manishyahoo

Labour rate is Rs.12/- per kg

Is This Answer Correct ?    4 Yes 9 No

Post New Answer




More Civil Engineering Interview Questions

what is the wait of cement in different concrete mixes from M15 TO M50

1 Answers   L&T,


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

0 Answers   KD infra,


1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?

1 Answers  


how to know rcc strength

2 Answers   L&T,


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

0 Answers  






HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

0 Answers  


how much bags of cement will be in 1 cmt of having the ratio 1:3:6

7 Answers  


define prestressing? compare prestressing with post tensioning?

2 Answers  


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

0 Answers  


how you confirm the hard stratum for driven cat in situ pile work?

2 Answers  


A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?

1 Answers  


What is unit weight of 1st class bricks ?

1 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (4631)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3698)
  • Electrical Engineering Interview Questions Electrical Engineering (15757)
  • Electronics Communications Interview Questions Electronics Communications (2635)
  • Chemical Engineering Interview Questions Chemical Engineering (761)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2875)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (169)
  • Engineering AllOther Interview Questions Engineering AllOther (1332)