I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What is portland cement
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
How do we determine the specific gravity of a cement?
What is the difference between built area and super built up area?
What is the difference between Hinged and pinned in Column ends
Aptitude, reasoning, quants, verbal and technical question
What is the difference between EPC,DBOOT and BOOT.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
how to remove the quantity of metal 1 and metal 2 in concrete
what is Short bored pile foundation.
it is possiblee to produce concrete with out cracks...
how to calculate the steel in 500yard
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
is basic cost of the material includes tax?