Answer Posted / sivaramkrishna
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is difference between combin footing & rapt footing
afe or not
All aptitude question of Bechtel
what is conrete grade ,how are depent on concrete grad and size of concrete?
How do you prepare Material Recovery Statement for deduction from contractors bills?
what r you reqired for concrete baching plant?
What is the difference between Fe 500, Fe 500 D and Fe 515.
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how statics is different from dynamics
how to calculate freeboard in under ground water tank and technical details
types of piles detail,
what is anchorage length,lap length and (dont remember the last one)
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
is concealed wiring a problem in fly ash brick wall?