Answer Posted / sivaramkrishna
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What will you do if a portion of load bearing wall collapses under your supervision?
What is the strength of cement?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
How can we convert weight batch to volume batch for m30 mix
how to tie 10 legged stirrups
explain the rale of the government in the construction industry
what is tension column?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
What is the cost difference between site mix and ready mix concrete per cubic meter
what is high type road and low type roads
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?