Answer / jim lowe
By accessing manual mode, force the motor fully closed, then
force it fully open and time how long it takes with a stop
watch.
| Is This Answer Correct ? | 1 Yes | 0 No |
What should be hight of CONTROL panel for access & OPERATION What is BIS & INDIAN STD for SAME?
Explain the difference between mmwc and mmwg?
my data card only does run in my mobile so how can change it that it run other mobile & computer and i can stor data in my data card
canu tell me why 4-20 ma and why not this 3-25ma?please give reason of this value.
When a field input to plc is coming from 400 to 600 meters and the input is in 24 V DC? So signal cable of which cross section i should select for proper signal to plc?
why dead weight tester called dead weight tester.
why bevelling is done in an orifice ?
How to erection of DCS Panel at site step by step
what is plc communication?
why we use -ve voltage in vibration monitoring system.generally we use 4 to 20 mA as output of instrument then why we use voltage in vibration
what is the zero and span trim?
how to calibrate control valves & power cylinders & ultra sonic level transmitters
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)