Answer / v.purushotham
1. Grade of concrete M20 so ratio is 1:11/2:3
let volume of concrete - 1cum
total ratio- 1+1.5+3 = 5.5
cement = 1x1.54/5.5 = 0.28 cum so cement is =0.28x
1440Kg/cum = 403.2 Kg = 8.064 bags
sand-0.28*1.5= 0.42cum
aggregate- 2.8*3= 0.84 cum
2. plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144
calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum
summation of ratio = 7
cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum
this formula applied for 6mm and 20mm also.
plaster area= paint area
| Is This Answer Correct ? | 89 Yes | 26 No |
Answer / padmarajan
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg.
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 15 Yes | 3 No |
Answer / sjtbehera
1. Grade of concrete M20 so ratio is 1:11/2:3
let volume of concrete - 1cum
total ratio- 1+1.5+3 = 5.5
cement = 1x15.4/5.5 = 2.8 cum so cement is =2.8/.347=8 bags
sand-2.8*1.5= 4.2cum
aggregate- 2.8*3= 8.4 cum
2. plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144
calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum
summation of ratio=7 so cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum
this formula applied for 6mm and 20mm also.
plaster area= paint area
| Is This Answer Correct ? | 57 Yes | 49 No |
which has high coefficient of discharge venturimeter or orificemeter
Calculate the quantity of concrete for the following. 2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m length.
what is the use in canals of longitudinal drains and cross drains in lining areas?
Concrete cover for slab, column, beam and footing?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
what is P.C.C ?
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
What is difference between limit state and working stress method? How it is applies in building structure.
what is the least count of staff ?
whike making bbs we deduct 2d for every bend in bar but theoretically we cant subtract 2d for every bend and for every dia of bar , so plz tell me the exact deduction for bends for different dia of bars and for different angles ??
what is the real de-shuttering time for rcc column,slaband wall
how many quantity of water use in 1cu.m. concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)