Used Cement & Sand in 1 Square Meter or 1 Square Feet For
Brick Work 0.115mm ? (1:4) (1:6)
No Answer is Posted For this Question
Be the First to Post Answer
The designs required to construct a building are ––
What is meant by solid geometry?
How to preparation billing for high rise building? anyhow can give the tips
Diagonal check is required for a layout work to confirm ––
State the type of roads and compare the advantages and disadvantages?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Define What happens to Load at yielding ?
Differenciate between One way slab and two way slab
can i get civil engineering test papers.......?????
which has high coefficient of discharge venturimeter or orificemeter
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
how many area req.in 15000liter water tank
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)