how to calculate quantities of sand , cement & aggregate in
1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of
10cm brick wall, paint quantity for 1m2 snowcem and lime
painting?
Answer Posted / sjtbehera
1. Grade of concrete M20 so ratio is 1:11/2:3
let volume of concrete - 1cum
total ratio- 1+1.5+3 = 5.5
cement = 1x15.4/5.5 = 2.8 cum so cement is =2.8/.347=8 bags
sand-2.8*1.5= 4.2cum
aggregate- 2.8*3= 8.4 cum
2. plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144
calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum
summation of ratio=7 so cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum
this formula applied for 6mm and 20mm also.
plaster area= paint area
| Is This Answer Correct ? | 57 Yes | 49 No |
Post New Answer View All Answers
What is meant by autocad?
What is a bearing capacity of soil?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
HOw much % of premium on DSR-2013 currently
Define aligned dimension?
please send me bhel questions on rupesh.017@rediffmail.com
Describe the sections included in a typical bill of quantities
how statics is different from dynamics
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how to calculate the size of triangular ring in rcc column?
What is demising walls?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Which ratio use for cement selery???