Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How Arc Extinguish in Minimum oil circuit breaker and What is
the function of Radial and axial vents of turbulator in
Minimum oil circuit Breaker Where these vents are exists.



How Arc Extinguish in Minimum oil circuit breaker and What is the function of Radial and axial ven..

Answer / tushar choudhuri

Rated interrupting time is the mean time for interruption of any current exceeding the rated interrupting current of the Breaker.The possible relaying time of modern high speed protection is 0.5 to 1,0 cycle.The breaker interrupting time of high speed modern circuit breaker is nearly 2 to 3 cycles.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is floating voltage?

1 Answers  


string efficient is 100% what is the voltage across the each disk?

1 Answers  


what is the difference between synchronization and paralleling?

13 Answers   BARC,


how to set the overload setting in the thermal overload relay?? is there any calculation in that??

3 Answers  


We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's

0 Answers  


what is high voltage in india?

11 Answers   Essar,


In case of 11kV dual delta bank what are the recommended protections with specific CT / VT requirements? The capacitor bank is to be connected to the main 11kV switchgear from where the H.V.Motors and auxiliary 440V loads.

1 Answers  


how to find number of run cable laying[LT side] for transformer & alternator secondary side? [above condition for getting output power transformer to main panel side] give the example.

0 Answers   L&T,


why in 3.5 core means 3 core for phase and .5 for neutral?

1 Answers   Sodexo,


What is the difference between double compression

7 Answers   Bhel, Hyundai, Orchid Chemicals and Pharmaceuticals, PDO, Prefamac,


In Power cable specification what is U0/U and Um.

0 Answers  


Waht is Inductor?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)