Answer / sam

This means that your transmitter is capable of measuring a
differential pressure of 300. Whatever this units of measure
is. You can calibrate the transmitter for any of the
following conditions:
LRV = -150 = 0%
URV = +150 = 100%
Therefore span = 300 UOM (units of measure)
or
LRV = 0 = 0%
URV = +150 = 100%
Therefore span = 150 UOM (units of measure)
or
LRV = -150 = 0%
URV = 0 = 100%
Therefore span = 150 UOM (units of measure)
or
You can also calibrate the tx for any span in between this
300 range.
To find the correct Z/S values for your application measure
the distance from the transmitter to zero position on the
vessel and multiply this with the density of the product you
want to measure (LRV). Do the same with your 100% (URV) value.
Good luck

Is This Answer Correct ?    21 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

State four different types of flow measurement.

4 Answers   ADMA OPCO,


we have a s-5 simense plc having op7 .recently on op7 showing error 1.plc not present 2. DB error frequently. can u have any solution . please send me.

0 Answers  


can you send remote seal interface level transmitter calculation steps for oil water saperator.

0 Answers   Sasol Firm, Thermax,


How many interlocks at turbine? Plz explain briefly

0 Answers   MRPL Mangalore Refinery and Petrochemicals Limited,


What FLOW METER generally used in Gas plant?

5 Answers   Gasco,






why use to 250 ohm for hart protocol and why hart communicator not communicate without 250 ohm 

4 Answers   OMV,


What is the PLC Level & type.

2 Answers   Bhushan Power Steel,


What is paid how it works

0 Answers   KOC,


please help me to get the below mentioned quires,which i have to submit for my client.[INSPECTION TEST PLAN] 1]I.T.P for Calibration of all instrument. 2]I.T.P for SS tubing. 3]I.T.P for Fire & Gas devices. 4]I.T.P for CCTV & telecommunication. 5] I.T.P for loop checking.

1 Answers  


full process of gas turbin?

0 Answers  


there are two candidates p and q in an election.During the campaign,40% of the voters promised to vote for P ,and rest for Q.however, on the day of election 15% of the voter went back on their promise to vote for P and instead voted for Q. 25% of the voters went back on their promise to vote for Q and instead voted for P.suppose,P lost by two votes,then what was the total no. of voters.

4 Answers   GATE,


what is the input of digital RPM indicator during the calibration time?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)