What is the strategies ? what is the need of the strategies?
Answers were Sorted based on User's Feedback
Answer / manoj
A strategy is a script which extract structural information
from database or flat files.
creating automatic class, joins,cardinality etc.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / madhu
The Strategies tab in the Parameters button of Universe
designer is used to detect joins and cardinality.
1.You can select how the classes and objects to be created.
(It also as ablility to automatically creates Classes from
Table name and Objects from Column names)
2.When you try to join 2 tables in universe designer you
find a DETECT button which performs its action when
selected, based on the JOIN statergy you set in this tab.
But it is always recomended to create classes, objects and
joins manually. In real time we never use the automatic
routine.
| Is This Answer Correct ? | 7 Yes | 0 No |
How many universes are required for a single project,and how many reports are required for a single Universe.
Is there any other repository domains rather than universe, security, document?
WHAT ARE THE META DATA TYPES?WHICH META USING IN BO'S
how to restrict up to three levels in hierarchy when u do drill mode?
what is zero client and thin client ?
how to sort on a particular object,that object is not picked up while creating the cross tab but we need to sort on the object that is not in the cross tab????
2 Answers Infosys, Keane India Ltd,
Hi All, I have found out this site very interesting and knowledge sharing site.I was wondering if you can tell me where I can get study materials for the BO XI 3.1 or suggest me the one that you have taken recently. Regards, Ace
Hi friends, How many types of dimentions are they ?What are they? Thanks in advance
What are the data types present in bo? What happens if we implement view in the designer and report?
I have two data providers with common dimension and measures. The only difference between two data providers is in condition 'Fiscal Year'.One data provider calculates for current year and other one calculates for previous year. So in prompts if I am passing 2008 as current year then the two data providers should be able to calculate for current year and previous year individually. So Can anybody tell me how to do calculation in data providers. ( I am using BO WebI report )
Explain in detail about type 2(scd),
Approximatly how many enduser can use the each bo project?