What is plant load factor?
Answer / karthikeyan
"Load Factor" is an indicator of how steady an electrical
load is over time.
If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.
LF = average demand / peak demand
for a given period of time.
Is This Answer Correct ? | 15 Yes | 9 No |
What is the use of the governor on diesel generator
5 Answers GLA University, Standard Chartered,
Why did you choose this career as an engineer
what is diploma?
how many types of jacks
which type of electrode can be used for welding hardox 400 to St37 ? and do i apply any heat treatment ?
where does stuffing box is placed
how does the belt tension is checked and what should be the tension?
What is the purpose of thrust bearing?
Draw a crankshaft and show the parts?
In Turbine how the balence piston works and what is the direction of leak of steam flow.
Can I ask "you are having experience in welding field?"
State the function of neck ring in centrifugal pump?