Answer Posted / p.s.naresh
under reineorcement
Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What are the advantages of cad software’s?
Which ratio use for cement selery???
What is an ortho mode?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Define What is aggregate?
For Wet Mix Mecadam design what is Optimum moisture content
what is pouring and explain
How to testing voids of filled aggregate in bitumen mix design
Calculation of curtain wall of box culvert
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)