What height of a 3.5 m high 300 x300 mm proposed col. can
be casted at a time ?
Answer Posted / kamlesh chauhan
we can not caste any ht more than 2.4 mt at a time,you can
caste only 2.4 mt ht at a time,because vertical drop of
concrete should not be more than 2.4 mt due to seggregation
problem.
| Is This Answer Correct ? | 17 Yes | 9 No |
Post New Answer View All Answers
how to calculate valuation for the old building?
I have an span length 16 ft c/c
Define What are the reasons for geotechnical site investigations in Uganda?
what is Brick crushing strength(PSI)?
How many square meter can a worker/labor demolish a structure per day?
What year was the keystone power plant in Indiana County constructed?
What is aggregate?
what is civil enginnering & what you need of this course?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
in the earthquqke the profile of water on dam is parabolic or not
Civil engineering related
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
What are the uses of groynes?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?