. What three Specific Job Positions do you target from the
Company
Answer / amit debnath
BEST THREE POST FROM THE TOP IN MY RESPECTIVE FIELD.
| Is This Answer Correct ? | 4 Yes | 0 No |
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
internal dia of sewer pipe should not be less than A] 15 cm B ] 20 cm C ] 25 cm
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
Define current ucs?
What are the RISKS during the project construction?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the standard unit of bricks???
Time required for curing of wall tiles before fixing
Lapping Work Explain Briefly
What is civgl engg?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)